A0541/25
Checking status...
Instrument Landing Systems

ILS CAT II procedure for RWY 21 is now standalone; GP inop minima cancelled.

2025-08-07 00:00 - PERM

Period of Applicability

2025-08-07 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS CAT II procedure for RWY 21 is now considered a standalone approach, and the GP inoperative minima from AIP Supplement 07/25 has been cancelled.

Message

THE ILS X RWY 21 CAT II PROCEDURE PUBLISHED IN AIRAC AIP SUP NR 07/25 SHALL BE CONSIDERED AS A STANDALONE CAT II APPROACH ONLY. THE GP INOP MINIMA PUBLISHED IN THE CORRESPONDING TABLE OF AIRAC AIP SUP NR 07/25 (ANNEXE 1) SHALL BE CANCELLED. CORRECT AIRAC AIP SUP NR 07/25

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) GMMM/QPFXX/IV/NBO/AE/000/999/3403N00645W025
A) GMME
B) 2508070000 C) PERM
E) THE ILS X RWY 21 CAT II PROCEDURE PUBLISHED IN AIRAC AIP SUP
NR 07/25 SHALL BE CONSIDERED AS A STANDALONE CAT II APPROACH ONLY.
THE GP INOP MINIMA PUBLISHED IN THE CORRESPONDING TABLE
OF AIRAC AIP SUP NR 07/25 (ANNEXE 1) SHALL BE CANCELLED.
CORRECT AIRAC AIP SUP NR 07/25
Issued about 1 month ago
Was this helpful?