A0865/25
Checking status...
Taxiway Operations

Taxiway R1 is closed due to construction connecting new terminal parking, with caution advised and ATC instructions to be followed.

2025-10-20 08:56 - 2025-11-20 23:59

Period of Applicability

2025-10-20 08:56 - 2025-11-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Effective 22 Sep 2025 (Phase 1), taxiway R1 is closed due to construction of new terminal aircraft parking and its connection to TWY R1 with installation of a frangible metal fence; personnel and equipment will vacate the area 15 minutes before each movement; caution is recommended and pilots should follow ATC instructions.

Message

REF AIP SUP NR 09/25 WEF 22 SEP 2025 PHASE 1: DUE TO CONSTRUCTION WORK OF ACFT PRKG OF NEW TERMINAL AND CONNECTION TO TWY R1 WITH THE INSTALLATION OF A FRANGIBLE METAL FENCE: TWY R1 CLSD. PRESENCE OF PERSONS AND EQPT WILL BE VACATED 15 MIN BFR EACH MOV. CAUTION RECOMMENDED. FOLLOW ATC INSTRUCTIONS.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0865/25 NOTAMR A0802/25
Q) GMMM/QMXLC/IV/M/A/000/999/3403N00645W005
A) GMME
B) 2510200856 C) 2511202359
E) REF AIP SUP NR 09/25 WEF 22 SEP 2025 PHASE 1:
DUE TO CONSTRUCTION WORK OF ACFT PRKG OF NEW TERMINAL
AND CONNECTION TO TWY R1 WITH THE INSTALLATION OF A FRANGIBLE
METAL FENCE:
TWY R1 CLSD.
PRESENCE OF PERSONS AND EQPT WILL BE VACATED 15 MIN BFR EACH MOV.
CAUTION RECOMMENDED.
FOLLOW ATC INSTRUCTIONS.
Issued 6 days ago
Was this helpful?