Taxiway R1 is closed due to construction connecting new terminal parking, with caution advised and ATC instructions to be followed.
Period of Applicability
2025-10-20 08:56 - 2025-11-20 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Effective 22 Sep 2025 (Phase 1), taxiway R1 is closed due to construction of new terminal aircraft parking and its connection to TWY R1 with installation of a frangible metal fence; personnel and equipment will vacate the area 15 minutes before each movement; caution is recommended and pilots should follow ATC instructions.
Message
REF AIP SUP NR 09/25 WEF 22 SEP 2025 PHASE 1: DUE TO CONSTRUCTION WORK OF ACFT PRKG OF NEW TERMINAL AND CONNECTION TO TWY R1 WITH THE INSTALLATION OF A FRANGIBLE METAL FENCE: TWY R1 CLSD. PRESENCE OF PERSONS AND EQPT WILL BE VACATED 15 MIN BFR EACH MOV. CAUTION RECOMMENDED. FOLLOW ATC INSTRUCTIONS.