A0392/26
Checking status...
ADRunway Operations

Construction works near RWY 35L axis with persons and equipment present.

2026-05-22 13:44 - 2026-06-10 17:00
Duration:aggregated 8 days

Period of Applicability

2026-05-22 13:44 - 2026-06-10 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction works for electrical substation 2 are taking place at ground level in the work zone on the extension of the RWY 35L axis north side of the threshold, with persons and equipment present. Caution is recommended. Schedule: 0730-1700.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0392/26 NOTAMR A0311/26
Q) GMMM/QMRHW/IV/NBO/A/000/999/3322N00735W005
A) GMMN
B) 2605221344 C) 2606101700
D) 0730-1700
E) CONSTRUCTION WORKS FOR ELECTRICAL SUBSTATION 2
AT GROUND LEVEL DESCRIBED BELOW.
THE WORK ZONE WILL BE IN THE EXTENSION OF THE RWY 35L AXIS NORTH
SIDE OF THE THRESHOLD:
* 594.86M FROM THR OF RWY 17R.
* 591.55M FROM THR OF RWY 17L.
* 4277.04M FROM THR OF RWY 35R.
* 4287.88M FROM THR OF RWY 35L.
* 115.76M WEST OF RWY 35L/17R AXIS.
PRESENCE OF PERSONS AND EQPT.
CAUTION RECOMMENDED.
Was this helpful?