Period of Applicability
2026-09-23 13:16 - 2026-10-03 16:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
From 27 April 2026, civil engineering and aerodrome ground lighting works are in progress for phases 1 and 4 of AIP SUP 01/26 in the parallel taxiway duplication area, primarily outside the TWY Q strip on uncommissioned TWY P and associated strips. Limited work within the runway strip at the RWY/TWY U1 junction will occur outside traffic or after the area is cleared; the strip will be inspected and serviceable for each movement. Lighting and guidance signs for uncommissioned TWY P and TWY U1 are switched off and obscured and must be disregarded. Declared distances and published taxiway characteristics remain unchanged. Personnel, vehicles and heavy equipment are present; use caution and follow ATC instructions.