A0659/26
Checking status...
ADLighting Systems

GMMX aeronautical ground lighting remains serviceable with Category I secondary power and no operational downgrade.

2026-09-04 14:35 - 2026-10-02 16:30
Duration:29 days

Period of Applicability

2026-09-04 14:35 - 2026-10-02 16:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

AIP GMMX AD 2.15, Other Lighting Systems—Secondary Power Supply, item 4 is temporarily amended. The aeronautical ground lighting secondary power supply meets Category I requirements with a 12-second switch-over time. All aeronautical ground lighting remains serviceable; aerodrome operations and published minima are unaffected, with no downgrade.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0659/26 NOTAMN
Q) GMMM/QLRXX/IV/NBO/A/000/999/3137N00802W005
A) GMMX
B) 2609041435 C) 2610021630
E) REF AIP GMMX AD 2.15 OTHER LIGHTING SYSTEMS - SECONDARY
POWER SUPPLY:
ITEM 4 TEMPORARILY AMENDED.
AGL SECONDARY POWER SUPPLY ENSURED IN ACCORDANCE WITH CAT I
REQUIREMENTS, SWITCH-OVER TIME IS 12 SEC.
ALL AGL SERVICEABLE.
AD OPS AND PUBLISHED MINIMUM ARE UNAFFECTED.
NO DOWNGRADE.
Was this helpful?