A0202/25
Checking status...
Runway Operations

Runway 22 is closed for maintenance, affecting landing and takeoff operations.

2025-06-20 07:27 - 2025-07-08 15:42

Period of Applicability

2025-06-20 07:27 - 2025-07-08 15:42

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 22 is closed for maintenance from the beginning up to 1450 meters. Aircraft will use runway 04 for landing and takeoff, but takeoff on runway 22 is permitted when wind conditions affect operations. This restriction is in effect daily from 0346 to 1542.

Message

DUE TO RWY MAINTENANCE,FROM THE BEGINNING OF RWY 22 UP TO 1450M IS CLSD.AIRCRAFT WILL LAND AND TAKEOFF ON RWY 04.BESIDES, TAKEOFF ON RWY 22 IS ALLOWED WHEN WIND AFFECTS THE OPERATION/FLIGHTS. PILOTS ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0202/25 NOTAMR A0181/25
Q) HAAA/QMRLC/IV/NBO/A/000/999/1136N03719E005
A) HABD B) 2506200727 C) 2507081542 
D) DLY 0346-1542
E) DUE TO RWY MAINTENANCE,FROM THE BEGINNING OF RWY 22 UP TO 1450M IS
CLSD.AIRCRAFT WILL LAND AND TAKEOFF ON RWY 04.BESIDES, TAKEOFF ON 
RWY 22 IS ALLOWED WHEN WIND AFFECTS THE OPERATION/FLIGHTS.
PILOTS SHOULD BE ADVISED TO USE THE BELOW DICLARED DISTANCES.
CURRENT DISTANCE AVAILABLE FOR OPERATIONS AFTER ADJUSTMENT RWY 22:
   -TAKE OFF RUN AVAILABLE (TORA)= 2250M.
   -TAKE OFF DISTANCE AVAILABLE (TODA) = 2250M.
   -ACCELERATE STOP DISTANCE AVAIALABLE (ASDA) = 2250M.
   -LANDING DISTANCE AVAILABLE (LDA) = 2250M.
 AND RWY 22
   -TAKE OFF RUN AVAILABLE (TORA)= 2250M.
   -TAKE OFF DISTANCE AVAILABLE (TODA) = 2310M.
 THEREFORE, PILOTS HAS TO TAKE PRECAUTION DURING LANDING AND 
TAKEOFF.
Issued at: 2025-06-20 07:27
Was this helpful?