A0122/25
Checking status...
Runway Operations

Runway 16R/34L is available for traffic for 7 days.

2025-05-08 08:25 - 2025-05-25 23:59

Period of Applicability

2025-05-08 08:25 - 2025-05-25 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 16R/34L is available for traffic 24 hours a day for 7 days. The AIP page AD2.HEGN-6 item 2.20 paragraph 2-1 has been suspended.

Message

RWY 16R/34L AVBL FOR TFC 7 DAYS H24. AIP PAGE AD2.HEGN-6 ITEM 2.20 PARA 2-1 SUSPENDED.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0122/25 NOTAMN
Q) HECC/QMRAH/IV/BO/A/000/999/2711N03348E005
A) HEGN B) 2505080825 C) 2505252359
E) RWY 16R/34L AVBL FOR TFC 7 DAYS H24.
AIP PAGE AD2.HEGN-6 ITEM 2.20 PARA 2-1 SUSPENDED.
Issued at: 2025-05-08 08:25
Was this helpful?