A0109/26
EST
Checking status...
ADApron Operations

Loose debris behind bay F3 affects towing and engine shutdown/start procedures for bays F3-F9.

2026-05-19 09:58 - 2026-06-09 08:00
Duration:21 days EST

Period of Applicability

2026-05-19 09:58 - 2026-06-09 08:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Loose debris is present behind bay F3. Aircraft proceeding to bays F3-F9 must shut down engines behind bay F2 for towing. Aircraft proceeding out of bays F3-F9 must be towed and start engines behind bay F2.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0109/26 NOTAMR A0082/26
Q) HKNA/QMAXX/IV/NBO/A/000/999/0119S03656E005
A) HKJK
B) 2605190958 C) 2606090800EST
E) PRESENCE OF LOOSE DEBRIS BEHIND BAY F3.ALL ACFT PCD TO BAY F3-F9 TO SHUT DOWN ENGINES BEHIND BAY F2 FOR TOWING.ACFT PCD OUT OF BAY F3-F9 TO BE TOWED AND START ENGINES BEHIND BAY F2.
Was this helpful?