4/1518
Checking status...
Approach Procedures

RNAV (RNP) Z approach procedure established for runway 34L at DEN with specified minimums.

2024-12-27 12:46 - 2025-11-29 12:46

Period of Applicability

2024-12-27 12:46 - 2025-11-29 12:46

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The RNAV (RNP) Z approach procedure for runway 34L at Denver International Airport has been established. The minimum decision altitudes and visibility requirements are outlined for various RNP categories, with a decision altitude for RNP 0.10 being 5788 feet, RNP 0.20 being 5814 feet, and RNP 0.30 being 5852 feet, all having a visibility requirement of 5000 feet for all categories.

Message

IAP DENVER INTL, DENVER, CO. RNAV (RNP) Z RWY 34L, ORIG-C... RNP 0.10 DA 5788/HAT 461 ALL CATS, VIS RVR 5000 ALL CATS. RNP 0.20 DA 5814/HAT 487 ALL CATS, VIS RVR 5000 ALL CATS. RNP 0.30 DA 5852/HAT 52...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZDV/QPIXX/I/NBO/A/000/999/3951N10440W005
A) KDEN
B) 2409131418
C) 2504251418EST
E) DEN DENVER INTL, DENVER, CO.
RNAV (RNP) Z RWY 34L, ORIG-C...
RNP 0.10 DA 5788/HAT 461 ALL CATS, VIS RVR 5000 ALL CATS. RNP 0.20 DA 5814/HAT 487 ALL CATS, VIS RVR 5000 ALL CATS. RNP 0.30 DA 5852/HAT 525 ALL CATS. FOR INOP ALS, INCREASE RNP 0.10 ALL CATS VISIBILITY TO 1 3/8 SM AND INCREASE RNP 0.20 ALL CATS VISIBILITY TO 1 3/8 SM. TEMPORARY CRANE 5544 MSL 1.1NM S OF RWY 34L (2024-ANM-939-TO 942-NRA). TEMPORARY CRANE/CONSTRUCTION EQUIPMENT UP TO 5483 MSL 1.3NM S OF RWY 34L (2024-ANM-880 TO 883-NRA).
Issued 10 months ago
Was this helpful?