6/3144
PERM
Checking status...
NavApproach Procedures

GON RNAV (GPS) RWY 33 instrument approach procedure updated with revised minima and notes.

2026-03-24 19:45 - PERM
Duration:PERMANENT

Period of Applicability

2026-03-24 19:45 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Groton-New London (GON) RNAV (GPS) RWY 33 instrument approach procedure is updated to ORIG-D with revised LNAV Category C visibility, PBN requirements note changed to “RNP APCH - GPS,” and a chart VDP published at 1.05 NM to RW33.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZBW/QPICH/I/NBO/A/000/999/4119N07202W005
A) KGON
B) 2603191500
C) PERM
E) GON GROTON-NEW LONDON, GROTON (NEW LONDON), CT.
RNAV (GPS) RWY 33, ORIG-C...
LNAV CAT C VISIBILITY 1 3/8. CHANGE PBN REQUIREMENTS NOTE TO READ: RNP APCH - GPS. CHART VDP AT 1.05 NM TO RW33.
THIS IS RNAV (GPS) RWY 33, ORIG-D.
Was this helpful?