Construction is adjacent to the west edge of Taxiway H between Taxiway B and the Signature Ramp south access.

2026-08-13 05:00 - 2026-10-28 23:00
Duration:3 months

Period of Applicability

2026-08-13 05:00 - 2026-10-28 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress adjacent to the west edge of Taxiway H between Taxiway B and the Signature Ramp south access; the work area is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2186/26 NOTAMN Q) KZLA/QMXHW////000/999/3604N11509W005 A) KLAS B) 2608130500 C) 2610282300 E) TWY H BTN TWY B AND SIGNATURE RAMP SOUTH ACCESS WIP CONST ADJ WEST EDGE LGTD AND BARRICADED