5/5769
Checking status...
Departure Procedures

CHATY FIVE SID transitions HENER, KWANG, and SAN MARCOS are not available except for RNAV GPS‑equipped aircraft due to FIM VOR outage.

2025-10-03 15:15 - 2025-12-03 15:15

Period of Applicability

2025-10-03 15:15 - 2025-12-03 15:15

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

From 03 Oct 2025 1515 until 03 Dec 2025 1515 EST, the CHATY FIVE departure at Los Angeles International (LAX) has the HENER, KWANG, and SAN MARCOS transitions not available except for aircraft equipped with a suitable RNAV system with GPS, due to the FIM VOR being out of service.

Message

SID LOS ANGELES INTL, LOS ANGELES, CA. CHATY FIVE DEPARTURE... HENER TRANSITION, KWANG TRANSITION, SAN MARCOS TRANSITION NA EXCEPT FOR AIRCRAFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FIM VOR OUT OF SERVICE. 2510031515-2512031515EST

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZLA/QPDCH/I/NBO/A/000/999/3356N11824W005
A) KLAX
B) 2504301541
C) 2512101541EST
E) LAX LOS ANGELES INTL, LOS ANGELES, CA.
CHATY FIVE DEPARTURE...
HENER TRANSITION, KWANG TRANSITION, SAN MARCOS TRANSITION NA EXCEPT FOR AIRCRAFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
FIM VOR U/S.
Issued 21 days ago
Was this helpful?