5/8467
Checking status...
Approach Procedures

Radar required for IAP at Macon Downtown, DBN TACAN out of service.

2025-03-03 15:35 - 2025-06-09 15:35

Period of Applicability

2025-03-03 15:35 - 2025-06-09 15:35

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

For the IAP at Macon Downtown, radar is required for all aircraft except those equipped with a suitable RNAV system with GPS. Additionally, the DBN TACAN is out of service. This NOTAM is effective from March 3, 2025, 15:35 UTC to June 9, 2025, 15:35 UTC.

Message

IAP MACON DOWNTOWN, MACON, GA. LOC RWY 10, AMDT 9... RADAR REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, DBN TACAN OUT OF SERVICE. 2503031535-2506091535EST

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZTL/QPIAO/I/NBO/A/000/999/3249N08333W005
A) KMAC
B) 2503031535
C) 2506091535EST
E) MAC MACON DOWNTOWN, MACON, GA.
LOC RWY 10, AMDT 9...
RADAR REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
DBN TACAN U/S.
Issued at: 2025-03-03 15:35
Was this helpful?