Instrument Approach Procedure LOC RWY 10 is affected due to DBN TACAN being out of service.
2025-03-03 15:35 - 2025-06-09 15:35
Period of Applicability
2025-03-03 15:35 - 2025-06-09 15:35
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Radar is required for the Instrument Approach Procedure LOC RWY 10, except for aircraft equipped with suitable RNAV systems with GPS. The DBN TACAN is out of service during the specified time frame.
Message
IAP MACON DOWNTOWN, MACON, GA. LOC RWY 10, AMDT 9... RADAR REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, DBN TACAN OUT OF SERVICE. 2503031535-2506091535EST
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-03-03 15:35
Was this helpful?