10/241
Checking status...
ADTaxiway Operations

The Taxiway A safety area has an irregular surface on its south side.

2026-10-21 15:49 - 2026-11-25 23:00
Duration:2 months

Period of Applicability

2026-10-21 15:49 - 2026-11-25 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The south side of the Taxiway A safety area between Runways 13L and 13R has an irregular surface.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9355/26 NOTAMN Q) KZAU/QMXXX////000/999/4147N08745W005 A) KMDW B) 2610211549 C) 2611252300 E) TWY A SAFETY AREA BTN RWY 13L AND RWY 13R IRREGULAR SFC S SIDE
Was this helpful?