V0002/25
Checking status...
Approach Procedures

Change of minima for ASR 22 approach at NBG.

2025-02-19 22:06 - 2025-05-16 23:59

Period of Applicability

2025-02-19 22:06 - 2025-05-16 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The instrument approach procedure for ASR 22 at NBG has changed. CAT AB minima changed to 600-1/2, CAT CDE minima changed to 600-1/4. If ALS is inoperative, increase CAT AB visibility to 1 mile and CAT CDE visibility to 1 1/4 miles.

Message

[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED FOR ASR 22, CHANGE MINIMA TO READ: CAT AB: 600-1/2 600 (600-1/2); CAT CDE: 600-1/4 600 (600-1 1/4). *ALS INOP INCREASE CAT AB VIS TO 1 MILE, CAT CDE INCREASE VIS TO 1 1/4 MILES.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0002/25 NOTAMN 
Q) ZHU/QPICH/I/BO/A/000/999/2949N09001W005 
A) KNBG 
B) 2502192206 
C) 2505162359 
E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED FOR ASR 22, CHANGE MINIMA TO READ: CAT AB: 600-1/2 600 (600-1/2); CAT CDE: 600-1/4 600 (600-1 1/4). *ALS INOP INCREASE CAT AB VIS TO 1 MILE, CAT CDE INCREASE VIS TO 1 1/4 MILES.
Issued at: 2025-02-19 22:06
Was this helpful?