6/5767
EST
Checking status...
NavDeparture Procedures

Runway 32L departure obstacle notes include a temporary crane and construction equipment.

2026-09-28 13:00 - 2026-12-15 20:14
Duration:3 months EST

Period of Applicability

2026-09-28 13:00 - 2026-12-15 20:14

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Eppley Airfield, the runway 32L takeoff obstacle notes for Takeoff Minimums and (Obstacle) Departure Procedures, Amendment 6A, are changed to include a temporary crane left of centerline and temporary construction equipment right of centerline; all other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4349/26 NOTAMN Q) KZMP/QPOCH/I/NBO/A/000/999/4118N09553W005 A) KOMA B) 2609281300 C) 2612152014 E) ODP EPPLEY AIRFIELD, OMAHA, NE. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 6A... TAKEOFF OBSTACLE NOTES: RWY 32L, TEMPORARY CRANE, 1133FT FROM DER, 272FT LEFT OF CENTERLINE, 60 AGL/1044 MSL (2026-ACE-344-NRA), TEMPORARY CONSTRUCTION EQUIPMENT, 1029FT FROM DER, 126FT RIGHT OF CENTERLINE, 25 AGL/1010 MSL (2026-ACE-343-NRA). ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?