09/861
Checking status...
ADTaxiway Operations

Open excavation adjacent to the east side of taxiway DD is lighted and barricaded.

2026-09-27 04:35 - 2026-10-27 12:00
Duration:2 months

Period of Applicability

2026-09-27 04:35 - 2026-10-27 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress with an open excavation adjacent to the east side of taxiway DD between runway 10L/28R and taxiway P; the excavation is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0283/26 NOTAMN Q) KZAU/QMXHW////000/999/4158N08754W005 A) KORD B) 2609270435 C) 2610271200 E) TWY DD BTN RWY 10L/28R AND TWY P WIP OPEN EXCAVATION ADJ EAST SIDE LGTD AND BARRICADED