11/259
Checking status...
Taxiway Operations

Work in progress on taxiway V between taxiway V2 and taxiway B with excavation at the south side.

2024-11-07 22:14 - 2024-11-15 12:00

Period of Applicability

2024-11-07 22:14 - 2024-11-15 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Excavation work is ongoing adjacent to the south side of taxiway V, which is lit and barricaded. Access is limited during the specified time frame from 2411072214 to 2411151200.

Message

TWY V BTN TWY V2 AND TWY B WIP OPN EXCAVATION ADJ SOUTH SIDE LGTD AND BARRICADED 2411072214-2411151200

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

11/259 NOTAMR 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2411072214 
C) 2411151200 

E) TWY V BTN TWY V2 AND TWY B WIP OPN EXCAVATION ADJ SOUTH SIDE LGTD AND BARRICADED