11/054
Checking status...
Taxiway Operations

Work in progress on TWY V between TWY V2 and TWY V3.

2024-11-02 10:40 - 2024-11-16 23:59

Period of Applicability

2024-11-02 10:40 - 2024-11-16 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Excavation is taking place on the south side, which is lit and barricaded. The work is scheduled from November 2, 2024, 10:40 UTC to November 16, 2024, 23:59 UTC.

Message

TWY V BTN TWY V2 AND TWY V3 WIP OPN EXCAVATION ADJ SOUTH SIDE LGTD AND BARRICADED 2411021040-2411162359

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

11/054 NOTAMN 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2411021040 
C) 2411162359 

E) TWY V BTN TWY V2 AND TWY V3 WIP OPN EXCAVATION ADJ SOUTH SIDE LGTD AND BARRICADED