10/444
Checking status...
Taxiway Operations

TWY N work in progress; excavation ongoing

2024-10-11 23:23 - 2024-11-30 23:00

Period of Applicability

2024-10-11 23:23 - 2024-11-30 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Twilight N between TWY A5 and TWY B1 is under work in progress due to an excavation adjacent to the north side, which is lighted and barricaded.

Message

TWY N BTN TWY A5 AND TWY B1 WIP OPN EXCAVATION ADJ NORTH SIDE LGTD AND BARRICADED 2410112323-2411302300

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

10/444 NOTAMR 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2410112323 
C) 2411302300 

E) TWY N BTN TWY A5 AND TWY B1 WIP OPN EXCAVATION ADJ NORTH SIDE LGTD AND BARRICADED