5/1408
Checking status...
Departure Procedures

Fayetteville transition unavailable except for RNAV equipped aircraft due to FAY VOR outage.

2025-06-10 17:52 - 2026-01-20 17:52

Period of Applicability

2025-06-10 17:52 - 2026-01-20 17:52

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The Fayetteville transition of the PACKK NINE departure is not available except for aircraft equipped with suitable RNAV systems with GPS due to the FAY VOR being out of service. This NOTAM is effective from June 10, 2025, 17:52 UTC to January 20, 2026.

Message

SID RALEIGH-DURHAM INTL, RALEIGH/DURHAM, NC. PACKK NINE DEPARTURE... FAYETTEVILLE TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FAY VOR OUT OF SERVICE. 2506101752-26012017...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZDC/QPDCH/I/NBO/A/000/999/3552N07847W005
A) KRDU
B) 2505131928
C) 2512231928EST
E) RDU RALEIGH-DURHAM INTL, RALEIGH/DURHAM, NC.
PACKK NINE DEPARTURE...
FAYETTEVILLE TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
FAY VOR U/S.
Issued at: 2025-06-10 17:52
Was this helpful?