4/9560
Checking status...
Instrument Landing Systems

RDU VORTAC out of service.

2024-12-20 16:17 - 2025-08-01 16:17

Period of Applicability

2024-12-20 16:17 - 2025-08-01 16:17

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

RDU VORTAC is out of service. Procedures ILS OR LOC RWY 23L AMDT 10, ILS OR LOC RWY 5R AMDT 31, and ILS RWY 5R (SA CAT I AND II) AMDT 31 are not available except for aircraft equipped with a suitable RNAV system with GPS.

Message

IAP RALEIGH-DURHAM INTL, RALEIGH/DURHAM, NC. ILS OR LOC RWY 23L, AMDT 10... ILS OR LOC RWY 5R, AMDT 31... ILS RWY 5R (SA CAT I AND II), AMDT 31... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE R...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZDC/QPIXX/I/NBO/A/000/999/3552N07847W005
A) KRDU
B) 2403240613
C) 2411030613EST
E) RDU RALEIGH-DURHAM INTL, RALEIGH/DURHAM, NC.
ILS OR LOC RWY 23L, AMDT 10...
ILS OR LOC RWY 5R, AMDT 31...
ILS RWY 5R (SA CAT I AND II), AMDT 31...
PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
RDU VORTAC U/S. 
Issued at: 2024-12-20 16:17
Was this helpful?