04/040
Checking status...
ADTaxiway Operations

Taxiway A west side between Gate B7 and Gate B9 is closed.

2026-04-30 09:13 - 2026-05-31 21:00
Duration:2 months

Period of Applicability

2026-04-30 09:13 - 2026-05-31 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway A west side 50 ft by 30 ft between Gate B7 and Gate B9 is closed and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0719/26 NOTAMN Q) KZDC/QMXLC////000/999/3730N07719W005 A) KRIC B) 2604300913 C) 2605312100 E) TWY A WEST SIDE 50FT BY 30FT BTN GATE B7 AND GATE B9 CLSD BARRICADED
Was this helpful?