4/0576
Checking status...
Departure Procedures

Canoga Three Departure for SID at Van Nuys, CA.

2024-11-07 14:37 - 2025-01-22 14:37

Period of Applicability

2024-11-07 14:37 - 2025-01-22 14:37

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The Fillmore Transition is not available except for aircraft equipped with a suitable RNAV system with GPS. The Avenal Transition and Gorman Transition require DME except for certain aircraft.

Message

SID VAN NUYS, VAN NUYS, CA. CANOGA THREE DEPARTURE... FILLMORE TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS. AVENAL TRANSITION, GORMAN TRANSITION DME REQUIRED EXCEPT FOR A...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZLA/QPDCH/I/NBO/A/000/999/3412N11829W005
A) KVNY
B) 2211272141
C) 2307092141EST
E) VNY VAN NUYS, VAN NUYS, CA.
CANOGA THREE DEPARTURE...
FILLMORE TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS.
AVENAL TRANSITION, GORMAN TRANSITION DME REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
FIM VOR U/S.