A0778/26
Checking status...
ADRunway Operations

Runway 09 markings are modified due to work in progress.

2026-07-03 03:04 - 2026-07-17 03:00
Duration:14 days

Period of Applicability

2026-07-03 03:04 - 2026-07-17 03:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 09 markings are modified due to work in progress: the south edge line is reduced width till the 11th edge light, threshold markings are reduced by 35 percent, the arrows on runway 09 markings have been removed, and the touchdown zone is reduced width.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0778/26 NOTAMR A0734/26
Q)LBSR/QMRXX/IV/NBO/A/000/999/4242N02324E005
A)LBSF
B)2607030304 C)2607170300
E)RWY 09 MARKINGS:
- SOUTH EDGE LINE REDUCED WIDTH TILL 11TH EDGE LIGHT
- THR MARKINGS WIDTH REDUCED BY 35 PERCENT
- THE ARROWS FROM THE MARKINGS ON RWY 09 HAVE BEEN REMOVED
DUE TO WIP
-TOUCHDOWN ZONE REDUCED WIDTH.
Was this helpful?