A0722/26
Checking status...
ASPMilitary Activity

Air refuelling will take place along N128 and participating aircraft must be SSR equipped and in contact with Nicosia ACC.

2026-06-30 05:20 - 2026-07-01 10:30
Duration:VERY SHORTaggregated 5 hours

Period of Applicability

2026-06-30 05:20 - 2026-07-01 10:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Air refuelling will take place along SUVAS - TEZAK - OTHON/ AH AAR A3, affecting airway N128. All participating aircraft shall be SSR equipped and in contact with Nicosia ACC. Scheduled 0520-1030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0722/26 NOTAMN
Q) LCCC/QWFLW/IV/M  /W /240/260/3320N03201E124
A) LCCC B) 2606300520 C) 2607011030
D) 0520-1030
E) AIR REFUELLING WILL TAKE PLACE ALONG
SUVAS - TEZAK - OTHON/ AH AAR A3
AFFECTED AWYS: N128
ALL PARTICIPATING AIRCRAFT SHALL BE SSR EQUIPPED AND
IN CONTACT WITH NICOSIA ACC.
F) FL240 G) FL260
Was this helpful?