A4988/25
Checking status...
Approach Procedures

IAC for AD 2-LEAL amended with speed control instructions effective January 25, 2024.

2025-07-28 08:04 - PERM

Period of Applicability

2025-07-28 08:04 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The IAC for AD 2-LEAL has been amended effective from January 25, 2024, with specific speed control instructions for missed approach procedures.

Message

REF AD 2-LEAL IAC/1.1 (WEF 25-JAN-24 AIRAC AMDT 17/23) AFTER THE MISSED APPROACH DESCRIPTION THIS NOTE MUST BE INCLUDED: -APP SPEED CONTROL: 1. UNLESS DIFERENT INSTRUCCIONS ARE RECIVED FROM ATC: CROSS IAF AT IAS 220 KT, CROSS IF OR COMPLETE FINAL TURN AT IAS 180KT, CROSS FAP 160 KT MAINTAINING THIS SPEED UP TO 4 NM OF THR. 2. IN THE EVENT OF BEING UNABLE TO COMPLY WITH IT, NOTIFY IT TO ATC AT THE FIRST COMMUNICATION

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LECB/QPIXX/I /NBO/A /000/999/3817N00033W005
A) LEAL B) 2507280804 C) PERM
E) REF AD 2-LEAL IAC/1.1 (WEF 25-JAN-24 AIRAC AMDT 17/23)
AFTER THE MISSED APPROACH DESCRIPTION THIS NOTE MUST
BE INCLUDED:
-APP SPEED CONTROL:
1. UNLESS DIFERENT INSTRUCCIONS ARE RECIVED FROM ATC:
CROSS IAF AT IAS 220 KT, CROSS IF OR COMPLETE FINAL
TURN AT IAS 180KT, CROSS FAP 160 KT MAINTAINING THIS
SPEED UP TO 4 NM OF THR.
2. IN THE EVENT OF BEING UNABLE TO COMPLY WITH IT,
NOTIFY IT TO ATC AT THE FIRST COMMUNICATION
Issued 14 days ago
Was this helpful?