B1888/25
Checking status...
Taxiway Operations

Work in progress on north strip taxiway T between G3 and E1.

2025-03-17 09:08 - 2025-03-29 18:00

Period of Applicability

2025-03-17 09:08 - 2025-03-29 18:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work is in progress on the north strip taxiway T between G3 and E1 at LEIB. The work is scheduled from 17th at 09:08 to 18:00 and from 18th to 29th daily from 07:00 to 18:00.

Message

WIP ON NORTH STRIP TWY T, BTN G3 AND E1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1888/25 NOTAMN
Q) LECB/QMWHW/IV/M  /A /000/999/3852N00122E005
A) LEIB B) 2503170908 C) 2503291800
D) 17 0908-1800, 18-29 0700-1800
E) WIP ON NORTH STRIP TWY T, BTN G3 AND E1
Issued at: 2025-03-17 09:08