B1898/25
Checking status...
Taxiway Operations

Work in progress on the north side of taxiway T strip.

2025-03-17 12:25 - 2025-03-29 05:30

Period of Applicability

2025-03-17 12:25 - 2025-03-29 05:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is work in progress on the north side of taxiway T strip, between G3 and E1, from 17th at 23:30 to 23:59, on 18th to 28th from 00:00 to 05:30 and 23:00 to 23:59, and on 29th from 00:00 to 05:30.

Message

WIP ON NORTH SIDE TWY T STRIP, BTN G3 AND E1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1898/25 NOTAMR B1830/25
Q) LECB/QMWHW/IV/M  /A /000/999/3852N00122E005
A) LEIB B) 2503171225 C) 2503290530
D) 17 2330-2359, 18-28 0000-0530 2300-2359, 29 0000-0530
E) WIP ON NORTH SIDE TWY T STRIP, BTN G3 AND E1
Issued at: 2025-03-17 12:25