A4674/26
Checking status...
ADTaxiway Operations

Resurfacing on taxiways B3, B4, Z3, BN1, N4 and N5 at LEMD.

2026-06-29 10:59 - 2026-08-05 23:59
Duration:2 months

Period of Applicability

2026-06-29 10:59 - 2026-08-05 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Resurfacing will take place on taxiways B3, B4, Z3, BN1, N4 and N5 at Madrid/Adolfo Suárez Madrid-Barajas AD (LEMD) from 4 September 2025.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4674/26 NOTAMN
Q) LECM/QMXXX/IV/BO /A /000/999/4028N00334W005
A) LEMD B) 2606291059 C) 2608052359
E) REF AIRAC SUP 161/25 WEF 04-SEP-25. MADRID/ADOLFO SUAREZ
MADRID-BARAJAS AD (LEMD).- RESURFACING ON TAXIWAYS B3, B4, Z3,
BN1, N4 AND N5. SUP CNL
Was this helpful?