Grass cutting works on runway 18L/36R strip with personnel and machinery present.
2025-04-28 06:00 - 2025-04-30 17:00
Period of Applicability
2025-04-28 06:00 - 2025-04-30 17:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Grass cutting works are taking place on the runway 18L/36R strip, with personnel and machinery present on both the east and west sides. The minimum distance from the runway centerline is 77.5 meters. Work is scheduled from 0600 to 1700.
Message
GRASS CUTTING WORKS RWY 18L/36R STRIP WITH PRESENCE OF PERSONNEL AND MACHINERY EAST AND WEST SIDE. MINIMUM DISTANCE 77,5M FROM RCL
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-23 11:21
Was this helpful?