A1459/25
Checking status...
Unknown Category

Revised SIDs for Runway 14L and 14R effective March 20, 2025.

2025-03-20 00:00 - PERM

Period of Applicability

2025-03-20 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Multiple Standard Instrument Departures (SIDs) for Runway 14L and 14R have been revised, effective March 20, 2025.

Message

-REF AD 2-LEMD SID 1 RWY 14L DAY TIME - RNAV1, SID 2, RWY 14L NIGHT TIME - RNAV1, SID 3 RWY 14R DAY TIME - RNAV1, AND SID 4 RWY 14R NIGHT TIME - RNAV1,(WEF 20-MAR-25 AMDT AIRAC 02/25), INCLUDE T...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1459/25 NOTAMN
Q) LECM/QPDCH/I /NBO/A /000/999/4028N00334W005
A) LEMD B) 2503200000 C) PERM
E) -REF AD 2-LEMD SID 1 RWY 14L DAY TIME - RNAV1, SID 2, 
 RWY 14L NIGHT TIME - RNAV1, SID 3 RWY 14R DAY TIME - 
 RNAV1, AND SID 4 RWY 14R NIGHT TIME - RNAV1,(WEF 20-MAR-25 
 AMDT AIRAC 02/25), INCLUDE THE FOLLOWING SENTENCE TO THE END 
 OF THE SECOND PARAGRAPH  OF CONTINGENCY DEPARURES: WAIT TOWER
 COMMUNICATION FOR FREQUENCY CHANGE.

-REF AD 2-LEMD SID 1.5, SID 2.5, SID 3.5, AND SID 4.5( WEF 
 20-MAR-25 AMDT AIRAC 02/25), MODIFY TO READ IN CONTINGENCY 
 DEPARTURE (ODP): BEFORE STARTING THE TAKE-OFF, FREQUENCY OF 
 SECTOR DESPEGUES MUST BE VERIFIED. WAIT TOWER COMMUNICATION 
 FOR FREQUENCY CHANGE.
Issued at: 2025-03-06 13:59
Was this helpful?