A0692/25
Checking status...
Construction Activity

WIP at levelled and unlevelled strip north of RWY 12/30 RWY between TWY H5-H6.

2025-02-02 23:00 - 2025-03-24 05:00

Period of Applicability

2025-02-02 23:00 - 2025-03-24 05:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress (WIP) at the levelled and unlevelled strip located to the north of Runway (RWY) 12/30 in between Taxiways H5-H6. Timing specified as February 2, 2300-2359; February 3rd to 28th, 0000-0500 and 2300-2359; March 1st to 23rd, 0000-0500 and 2300-2359; and March 24th, 0000-0500.

Message

WIP AT LEVELLED AND UNLEVELLED STRIP NORTH OF RWY 12/30 RYW BTN TWY H5-H6 (REF SUP 59/24 PHASE 3

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0692/25 NOTAMN
Q) LECB/QMWHW/IV/NBO/A /000/999/3929N00029W005
A) LEVC B) 2502022300 C) 2503240500
D) FEB 02 2300-2359, FEB 03-28 0000-0500 2300-2359, MAR 01-23 
0000-0500 2300-2359, MAR 24 0000-0500
E) WIP AT LEVELLED AND UNLEVELLED  STRIP NORTH OF RWY 12/30 RYW 
BTN TWY H5-H6
(REF SUP 59/24 PHASE 3
Issued at: 2025-01-31 11:12