WIP at levelled and unlevelled strip north of RWY 12/30 RWY between TWY H5-H6.
2025-02-02 23:00 - 2025-03-24 05:00
Period of Applicability
2025-02-02 23:00 - 2025-03-24 05:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress (WIP) at the levelled and unlevelled strip located to the north of Runway (RWY) 12/30 in between Taxiways H5-H6. Timing specified as February 2, 2300-2359; February 3rd to 28th, 0000-0500 and 2300-2359; March 1st to 23rd, 0000-0500 and 2300-2359; and March 24th, 0000-0500.
Message
WIP AT LEVELLED AND UNLEVELLED STRIP NORTH OF RWY 12/30 RYW BTN TWY H5-H6 (REF SUP 59/24 PHASE 3
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-01-31 11:12