A6616/26
Checking status...
NavApproach Procedures

Runway 32L approach minima have changed, and runway 14R Category II/III ILS use is conditional.

2026-10-12 05:00 - 2026-10-16 13:30
Duration:SHORTaggregated 3 days

Period of Applicability

2026-10-12 05:00 - 2026-10-16 13:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Operating minima have changed for ILS Z, ILS Y, LPV and LNAV/VNAV approaches to runway 32L. For ILS Z, ILS Y and LPV, the DA(H)/RVR/OCH are: category A 760(270)/1300/261, B 770(280)/1300/273, C 780(290)/1400/281, D and DL 790(300)/1400/292. For LNAV/VNAV, they are: category A 860(370)/1500/261, B 870(380)/1500/273, C 890(400)/1800/292 and D 920(420)/1900/319. Category II/III ILS approaches to runway 14R are authorized only when LVP procedures are in use or for planned test activities; a 15-minute delay is necessary to use those procedures for planned tests or in bad weather. Scheduled for the 12th–15th from 0500 to 1530 and the 16th from 0500 to 1330.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A6616/26 NOTAMN
Q) LFBB/QPICH/I /NBO/A /000/999/4338N00122E005
A) LFBO B) 2610120500 C) 2610161330
D) 12-15 0500-1530, 16 0500-1330
E) OPERATING MINIMA ILS Z 32L, ILS Y 32L AND LPV 32L CHANGED :
ILS Z, ILS Y, LPV
CAT     DA(H)          RVR      OCH
A       760(270)       1300       261
B       770(280)       1300       273
C       780(290)       1400       281
D       790(300)       1400       292
DL      790(300)       1400       292
- REF AD2 LFBO IAC RWY32L FNA ILS Z LOC Z,
AD2 LFBO IAC RWY32L FNA ILS Y LOC Y,
AD2 LFBO IAC RWY32L FNA RNP
OPERATING MINIMA LNAV-VNAV 32L CHANGED :
LNAV-VNAV
CAT     DA(H)          RVR     OCH
A       860(370)       1500       261
B       870(380)       1500       273
C       890(400)       1800       292
D       920(420)       1900       319
- REF AD2 LFBO IAC RWY32L FNA RNP
APCH PROC CAT II/III ILS 14R ONLY AUTHORIZED IF LVP PROC ARE USED
OR FOR PLANNED TEST ACTIVITIES.
FOR PLANNED TEST ACTIVITIES OR WHEN WEATHER CONDITIONS ARE BAD :
15 MINS DELAY WILL BE NECESSARY TO USE CAT II/III PROCEDURES.
Was this helpful?