A7275/26
Checking status...
NavApproach Procedures

LFBO runway 32L approach minima are modified, and CAT II/III ILS approaches to runway 14R are subject to conditions and delays.

2026-11-02 06:00 - 2026-11-06 14:30
Duration:SHORTaggregated 3 days

Period of Applicability

2026-11-02 06:00 - 2026-11-06 14:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At LFBO, operating minima are modified for the ILS Z, ILS Y, LPV and LNAV/VNAV approaches to runway 32L. ILS Z, ILS Y and LPV decision altitudes range from 760 to 790 ft, with RVR minima of 1,300–1,400 m; LNAV/VNAV decision altitudes range from 860 to 920 ft, with RVR minima of 1,500–1,900 m, depending on aircraft category. CAT II/III ILS approaches to runway 14R are authorized only when low-visibility procedures are in use or for planned tests. A 15-minute delay is required to use CAT II/III procedures for planned tests or in bad weather. Schedule: days 02–05, 0600–1630, and day 06, 0600–1430.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A7275/26 NOTAMN
Q) LFBB/QPICH/I /NBO/A /000/999/4338N00122E005
A) LFBO B) 2611020600 C) 2611061430
D) 02-05 0600-1630, 06 0600-1430
E) OPERATING MINIMA ILS Z 32L, ILS Y 32L ET LPV 32L MODIFIED :
ILS Z, ILS Y, LPV
CAT     DA(H)          RVR      OCH
A       760(270)       1300       261
B       770(280)       1300       273
C       780(290)       1400       281
D       790(300)       1400       292
DL     790(300)       1400       292
- REF : AD2 LFBO IAC RWY32L FNA ILS Z LOC Z, AD2 LFBO IAC RWY32L FNA
ILS Y LOC Y, AD2 LFBO IAC RWY32L FNA RNP
OPERATING MINIMA  LNAV-VNAV 32L MODIFIED :
LNAV-VNAV
CAT     DA(H)          RVR     OCH
A       860(370)       1500       261
B       870(380)       1500       273
C       890(400)       1800       292
D       920(420)       1900       319
- REF : AD2 LFBO IAC RWY32L FNA RNP
APCH PROC CAT II/III ILS 14R AUTHORIZED ONLY IF LVP PROC ARE USED OR
FOR PLANNED TEST ACTIVITIES.
FOR PLANNED TEST ACTIVITIES OR WHEN WEATHER CONDITIONS ARE BAD :
15 MINS DELAY WILL BE NECESSARY TO USE CAT II/III PROCEDURES.
Was this helpful?