A0754/25
Checking status...
Publication Updates

Permanent AIP amendment effective April 17, 2025, with updates on data exchange and ATC procedures.

2025-04-17 00:00 - 2025-04-30 23:59

Period of Applicability

2025-04-17 00:00 - 2025-04-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

This NOTAM announces a permanent amendment to the AIP effective from April 17, 2025, including updates on data exchange with the Network Manager Operations Center and advanced ATC tower procedures.

Message

TRIGGER NOTAM-PERM AIP AIRAC AMDT 03/25 WEF 17 APR 25. UPDATED INFO IN: - 2.22.8 ON EXCHANGE OF DATA WITH NETWORK MANAGER OPS CENTER (NMOC) - ADVANCED ATC TWR. - AD 2-LGAV-IAC-15 - AD 2-LGAV-IAC-16 ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0754/25 NOTAMN
Q) LGGG/QFATT/IV/BO /A /000/999/3756N02357E005
A) LGAV B) 2504170000 C) 2504302359
E) TRIGGER NOTAM-PERM AIP AIRAC AMDT 03/25 WEF 17 APR 25.
UPDATED INFO IN: 
- 2.22.8 ON EXCHANGE OF DATA WITH NETWORK MANAGER OPS CENTER (NMOC) 
- ADVANCED ATC TWR.
- AD 2-LGAV-IAC-15
- AD 2-LGAV-IAC-16
- AD 2-LGAV-IAC-17
- AD 2-LGAV-IAC-18
- AD 2-LGAV-IAC-19
- AD 2-LGAV-IAC-20
- AD 2-LGAV-IAC-21
- AD 2-LGAV-SID-1
- AD 2-LGAV-SID-4
- AD 2-LGAV-SID-6
- AD 2-LGAV-SID-8
- AD 2-LGAV-SID-13
- AD 2-LGAV-SID-14
- AD 2-LGAV-STAR-1
- AD 2-LGAV-STAR-3
- AD 2-LGAV-VFR.
Issued at: 2025-03-06 06:36
Was this helpful?