V0158/25
Checking status...
Approach Procedures

Revised STAR for Runway 27 includes changes to BAVES 1A and NAVUS 1A/1B.

2025-06-12 00:01 - 2025-08-07 00:01

Period of Applicability

2025-06-12 00:01 - 2025-08-07 00:01

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The STAR for Runway 27 has been revised, changing BAVES 1A from J65 to J65/N1 and NAVUS 1A/1B from J62 to J62/Y145.

Message

[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT ARRIVAL (STAR) CHANGED STAR RWY 27; REVISE BAVES 1A J65 TO J65/N1, NAVUS 1A/1B J62 TO J62/Y145.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0158/25 NOTAMN 
Q) LGGG/QPICH/I/BO/A/000/999/3520N02510E005 
A) LGIR 
B) 2506120001 
C) 2508070001 
E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT ARRIVAL (STAR) CHANGED STAR RWY 27; REVISE BAVES 1A J65 TO J65/N1, NAVUS 1A/1B J62 TO J62/Y145.
Issued 27 days ago
Was this helpful?