Revised SID for Runway 30 includes multiple changes to waypoints and routes.
2025-06-12 00:01 - 2025-08-07 00:01
Period of Applicability
2025-06-12 00:01 - 2025-08-07 00:01
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The SID for Runway 30 has been changed, with revisions to the planview and DRD including BAVES 1N from J65 to J65/N1, LABUX 1N from V57 to V57/N136, NAVUS 1N from J62 to J62/Y145, OTREX 1N from R78 to R78/M978, and XAVIS 1N from A14 to A14/M127.
Message
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) CHANGED SID RWY 30, REVISE PLANVIEW AND DRD AS FOLLOWS; BAVES 1N J65 TO J65/N1. LABUX 1N V57 TO V57/N136. NAVUS 1N J62 TO J62/Y145. OTREX 1N R78 TO R78/M978. XAVIS 1N A14 TO A14/M127.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 27 days ago
Was this helpful?