A2317/26
Checking status...
OBSConstruction Activity

Two electrical pole obstacles erected next to Apron 3 with ICAO-compliant lighting.

2026-04-20 07:51 - 2026-07-20 21:59
Duration:LONG4 months

Period of Applicability

2026-04-20 07:51 - 2026-07-20 21:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Two electrical pole obstacles have been erected next to Apron 3, each 20 m AGL at the specified coordinates, with obstacle lighting installed per ICAO Annex 14.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2317/26 NOTAMR A0339/26
Q) LHCC/QOBCE/IV/M  /A /000/999/4641N01710E005
A) LHSM B) 2604200751 C) 2607202159EST
E) TWO OBSTACLES ERECTED NEXT TO APRON 3.
THE HEIGHT OF THE ELECTRICAL POLES ARE 20M AGL.
PSN OF THE POLES ARE 464143.07N 0170936.65E AND 464151.37N
0170932.05E. OBST LIGHTING INSTALLED ACCORDING TO ICAO ANNEX 14.
Was this helpful?