Period of Applicability
2026-11-02 11:23 - 2027-01-19 20:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
The secondary power supply for aerodrome lighting is available with a switch-over time of more than 1 second but less than 15 seconds due to an uninterruptible power supply (UPS) failure. Take-offs on runway 08/26 are not permitted when RVR is below 800 m. See AIP AD 2 LICC 1-36 and 1-43.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?