B6941/26
EST
Checking status...
ADLighting Systems

Aerodrome lighting backup power has a delayed switch-over, restricting low-visibility take-offs on runway 08/26.

2026-11-02 11:23 - 2027-01-19 20:00
Duration:3 months EST

Period of Applicability

2026-11-02 11:23 - 2027-01-19 20:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The secondary power supply for aerodrome lighting is available with a switch-over time of more than 1 second but less than 15 seconds due to an uninterruptible power supply (UPS) failure. Take-offs on runway 08/26 are not permitted when RVR is below 800 m. See AIP AD 2 LICC 1-36 and 1-43.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B6941/26 NOTAMR B6417/26
Q) LIRR/QFAXX/IV/NBO/A /000/999/3728N01504E005
A) LICC B) 2611021123 C) 2701192000EST
E) SECONDARY POWER SUPPLY FOR AERODROME LIGHTING
AVAILABLE WITH SWITCH-OVER TIME MORE THAN 1 SEC BUT LESS THAN 15 SEC
DUE TO UNINTERRUPTIBLE POWER SUPPLY (UPS) FAILURE.
TAKE-OFF OPS RWY 08/26 WITH RVR BELOW 800M NOT PERMITTED.
REF AIP AD 2 LICC 1-36 AND 1-43
Was this helpful?