A5869/26
Checking status...
ADRunway Operations

Runway 17R/35L is closed for work, with crossings available on a tactical basis.

2026-11-03 10:30 - 2026-11-03 12:00
Duration:VERY SHORT2 hours

Period of Applicability

2026-11-03 10:30 - 2026-11-03 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 17R/35L is closed due to work in progress. Its lighting system is on test, and runway crossings are available on a tactical basis. Refer to AIP AD 2 LIMC 2-1.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5869/26 NOTAMN
Q) LIMM/QMRLC/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2611031030 C) 2611031200
E) RWY 17R/35L CLOSED DUE TO WIP.
RMK: LGT SYSTEM RWY 17R/35L ON TEST.
CROSSING RWY 17R/35L AVBL ON TACTICAL BASIS.
REF AIP AD 2 LIMC 2-1
Was this helpful?