A5434/26
Checking status...
ADRunway Operations

Runway 17R/35L is closed for work, with crossings available on a tactical basis; runway 17L/35R remains open.

2026-10-14 22:00 - 2026-10-15 03:30
Duration:VERY SHORT6 hours

Period of Applicability

2026-10-14 22:00 - 2026-10-15 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 17R/35L is closed due to work in progress. Runway 17L/35R remains open. The runway 17R/35L lighting system is undergoing testing, and crossings of the closed runway may be permitted on a tactical basis. Refer to AIP AD 2 LIMC 2-1.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5434/26 NOTAMN
Q) LIMM/QMRLC/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2610142200 C) 2610150330
E) RWY 17R/35L CLSD DUE TO WIP,
RWY 17L/35R OPEN.
RMK: LGT SYSTEM RWY 17R/35L ON TEST, CROSSING RWY 17R/35L AVBL ON
TACTICAL BASIS.
REF AIP AD 2 LIMC 2-1
Was this helpful?