A4482/26
Checking status...
ADRunway Operations

Runway 17R/35L is closed for work, with tactical crossings available; runway 17L/35R remains open.

2026-09-02 22:00 - 2026-09-03 03:30
Duration:VERY SHORT6 hours

Period of Applicability

2026-09-02 22:00 - 2026-09-03 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 17R/35L is closed due to work in progress, while runway 17L/35R remains open. The runway 17R/35L lighting system is under test, and crossings of runway 17R/35L are available on a tactical basis. Reference AIP AD 2 LIMC 2-1.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4482/26 NOTAMN
Q) LIMM/QMRXX/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2609022200 C) 2609030330
E) RWY 17R/35L CLSD DUE TO WIP.
RWY 17L/35R OPEN.
RMK: LGT SYSTEM RWY 17R/35L ON TEST,
CROSSING RWY 17R/35L AVBL ON TACTICAL BASIS
REF AIP AD 2 LIMC 2-1
Was this helpful?