Period of Applicability
2026-07-14 13:16 - 2026-10-10 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Standard instrument departure procedures are changed for SID RNAV1 or RNP1 RWY 12 LUMAV 1K, LOMED 1K, LOMED 1J, LUPOS 1K, LUPOS 1J, PELEG 1K and PELEG 1J, and SID VOR RWY 12 LUMAV 1U, LOMED 1U, LUPOS 1U and PELEG 1U. The minimum climb gradient is raised to 8.0 percent (486 ft/NM) until passing 4000 ft due to a temporary obstacle. Ref AIP AD 2 LIPE 6-1/3/4/5/11/13.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?