A5180/25
Checking status...
Runway Operations

Runway 15/33 and taxiway A closed to all traffic for work in progress; personnel and equipment on site.

2025-09-15 21:00 - 2025-09-18 04:00

Period of Applicability

2025-09-15 21:00 - 2025-09-18 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 15/33 and taxiway A are closed to all traffic due to work in progress; personnel and equipment present and in radio contact with tower; runway and taxiway may be available with 30 minutes prior notice; scheduled on the 15th and 17th from 2100 to 0400 (as published).

Message

RWY 15/33 AND TWY A CLOSED TO ALL TRAFFIC DUE TO WIP. PRESENCE MEN AND EQPT IN RADIO CTC WITH TWR RMK: RWY 15/33 AND TWY A AVBL 30 MIN PN REF AIP AD 2 LIRA 2-1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LIRR/QMRLC/IV/NBO/A /000/999/4148N01236E005
A) LIRA B) 2509152100 C) 2509180400
D) 15 17 2100-0400
E) RWY 15/33 AND TWY A CLOSED TO ALL TRAFFIC DUE TO WIP.
PRESENCE MEN AND EQPT IN RADIO CTC WITH TWR
RMK: RWY 15/33 AND TWY A AVBL 30 MIN PN
REF AIP AD 2 LIRA 2-1
Issued 4 days ago
Was this helpful?