A4935/26
Checking status...
ADRunway Operations

Runway 16L/34R and specified sections of taxiways C and D are closed due to work in progress.

2026-09-21 20:00 - 2026-10-21 04:00
Duration:aggregated 9 days

Period of Applicability

2026-09-21 20:00 - 2026-10-21 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 16L/34R, taxiway C between taxiway CD (included) and taxiway CL (excluded), and taxiway D between taxiway DA (included) and taxiway DM (excluded) are closed due to work in progress, Mondays through Saturdays from 2000 to 0400. ICAO signals are provided.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4935/26 NOTAMN
Q) LIRR/QMRLC/IV/NBO/A /000/999/4148N01214E005
A) LIRF B) 2609212000 C) 2610210400
D) MON-SAT 2000-0400
E) RWY 16L/34R, TWY 'C' BTN TWY 'CD' (INCLUDED) AND 'CL' (EXCLUDED),
TWY 'D' BTN TWY 'DA' (INCLUDED) AND 'DM' (EXCLUDED) CLSD DUE TO WIP
RMK: ICAO SGL PROVIDED
REF AIP AD 2 LIRF 2-1
Was this helpful?