A5647/26
EST
Checking status...
OBSCrane Operations

Temporary cranes at Roma/Fiumicino require higher minimum altitudes and procedure changes.

2026-10-21 16:25 - 2027-01-18 23:59
Duration:LONG3 months EST

Period of Applicability

2026-10-21 16:25 - 2027-01-18 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Roma/Fiumicino (LIRF), temporary cranes 5, 6, 7, 8, 9 and 11 penetrate the inner horizontal surface, requiring higher minimum altitudes and procedure changes described in SUP S42/26. The supplement is in force from 3 September 2026 to 30 June 2027.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5647/26 NOTAMR A5583/26
Q) LIRR/QOBCE/IV/BO /A /000/999/4148N01214E005
A) LIRF B) 2610211625 C) 2701182359EST
E) SUP S42/26 'AD ROMA/FIUMICINO (LIRF): TEMPORARY CRANES AND
VARIATION OF OCA (OCH)' IN FORCE FM 03 SEP 2026 TO 30 JUN 2027.
TEMPORARY CRANES PENETRATING INNER HORIZONTAL SURFACE WILL BE
ERECTED AS FLW:
CRANES 5, 6, 7, 8, 9 AND 11.
RMK: PRESENCE OF CRANES RESULTS IN RAISING MINIMUM ALTITUDES AND
PROCEDURES AS DESCRIBED IN SUP IN SUBJECT.
Was this helpful?