Period of Applicability
2026-10-12 10:43 - 2026-12-15 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
An operational trial sets ATC criteria for changing from the preferential runway configuration. ATC considers runway and taxiway availability, instrument approaches and landing aids, and significant weather, including steady tailwind above 8 kt or crosswind above 30 kt (excluding gusts), windshear, thunderstorms, and wet or poorly braking runways. Wind components are runway-selection guidelines, not operational limits. Configuration 34R may change to 16L when the surface wind component from northern quadrants remains steadily below 8 kt for at least 10 minutes; the actual change may be delayed until traffic permits. See AIP AD 2 LIRF 1-25.