Increased obstacle clearance heights for ILS and RNP approaches at runways 28 and 10.
Period of Applicability
2025-07-08 17:00 - 2025-09-30 00:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
The obstacle clearance altitude/height (OCA/H) has been increased for various approaches at runway 28 and runway 10, affecting all aircraft categories. Specific increases are detailed for ILS and RNP approaches, with notable changes for LNAV/VNAV and LPV procedures.
Message
OCA/H INCREASED AS FOLLOWS: ILS Z AND ILS Y RWY 28 (REF AIP AD 2-LKVO-7-1, AD 2-LKVO-7-3): OCA/H INCREASED TO 1140/225 FOR ALL CATEGORIES (A,B,C). RNP RWY 28 (REF AIP AD 2-LKVO-7-5): LNAV/VNAV OCA/H INCREASED TO 1215/300. LPV OCA/H INCREASED TO 1140/225 FOR ALL CATEGORIES (A,B,C). RNP RWY 10 (REF AIP AD 2-LKVO-7-9): LNAV OCA/H INCREASED TO 1260/380. LNAV/VNAV OCA/H INCREASED TO 1165/285. LPV OCA/H INCREASED TO 1165/285 FOR ALL CATEGORIES (A,B,C). CIRCLING APCH: CAT A OCA/H INCREASED TO 1360/440